Highlights of the year
- Record percentage of corporate responsibility targets achieved: 13 out of 16 completed, 2 ongoing, one delayed.
- Power generation capacity increased by 27.5 Megawatts (MW): Two additional energy from waste (EfW) facilities incorporated into operations.
- Energy and efficiency reviews conducted across all materials recycling facilities (MRFs), major reprocessing operations and landfills. Significant saving opportunities identified; programme of implementation and evaluation established.
- 1.9m tonnes of material recovered/ recycled. Six major recycling-led contracts secured or started.
- 5 new recycling facilities operational at Ford, Salmon Pastures and Bargeddie MRFs, and Deepmoor and Waithlands in-vessel composting plants (IVCs).
- Greater Manchester: UK's largest integrated waste and renewable energy PFI contract became operational - A Viridor Laing joint venture delivering services for Greater Manchester Waste Disposal Authority; all planning consents achieved; Greater Manchester Waste Ltd integrated into Viridor; construction programme underway, 22 new facilities built and operational.
- Winner at National Awards for Excellence in Recycling and Waste Management 2009 - Innovation in Design of a Waste Management Facility category. Shortlisted for two awards at National Recycling Awards and commended in two categories at the Organics Recycling awards.
- Employee survey completed - excellent response rate and results show high levels of satisfaction with company workplace, vision and internal communications.
- Training review completed. Training department strengthened, along with increased access for all employees to regular training opportunities, with particular focus on health and safety training initiatives.
- Viridor Biodiversity Action Plans in place at three key sites - Tatchells, Warmwell and Odcombe closed landfills. UK Biodiversity Benchmark initial assessment passed.
| Viridor Operations | Number |
|---|---|
| Head / Regional Office | 6 |
| Support Services (other) | 5 |
| Educational Centres | 7 |
| Material Recycling Facilities (MRF) | 18 |
| Transfer stations and other recycling | 45 |
| Composting | 11 |
| Household Waste Recycling Centres | 78 |
| Energy from Waste (EfW) | 3 |
| Power Plants (Landfill Gas) | 31 |
| Liquid Waste Services | 3 |
| Landfill Operational | 22 |
| Landfill Closed | 24 |
| Collection services (depot) | 29 |
| TOTAL NO. OPERATING UNITS | 282 |
| BASE DATA | 2009-10 |
|---|---|
| Total waste inputs to Viridor facilities | 6.6 million tonnes |
| Total waste handled | 7.8 million tonnes |
| Total organic waste composted | 171,000 tonnes |
| TOTAL WASTE RECYCLED BY VIRIDOR * | 1.7 million tonnes |
| Organic waste sent to 3rd party sites | 198,000 tonnes |
| Total material recovered for recycling | 1.9 million tonnes |
| Relative amounts of materials recovered as a proportion of total waste inputs | 29% |
| Renewable power generation capacity ** | 130.5 MW |
* includes organic waste composted and traded recycling volumes
** includes 3MW of sub-contract capacity in Suffolk
