Highlights of the year

  • Record percentage of corporate responsibility targets achieved: 13 out of 16 completed, 2 ongoing, one delayed.
  • Power generation capacity increased by 27.5 Megawatts (MW): Two additional energy from waste (EfW) facilities incorporated into operations.
  • Energy and efficiency reviews conducted across all materials recycling facilities (MRFs), major reprocessing operations and landfills. Significant saving opportunities identified; programme of implementation and evaluation established.
  • 1.9m tonnes of material recovered/ recycled. Six major recycling-led contracts secured or started.
  • 5 new recycling facilities operational at Ford, Salmon Pastures and Bargeddie MRFs, and Deepmoor and Waithlands in-vessel composting plants (IVCs).
  • Greater Manchester: UK's largest integrated waste and renewable energy PFI contract became operational - A Viridor Laing joint venture delivering services for Greater Manchester Waste Disposal Authority; all planning consents achieved; Greater Manchester Waste Ltd integrated into Viridor; construction programme underway, 22 new facilities built and operational.
  • Winner at National Awards for Excellence in Recycling and Waste Management 2009 - Innovation in Design of a Waste Management Facility category. Shortlisted for two awards at National Recycling Awards and commended in two categories at the Organics Recycling awards.
  • Employee survey completed - excellent response rate and results show high levels of satisfaction with company workplace, vision and internal communications.
  • Training review completed. Training department strengthened, along with increased access for all employees to regular training opportunities, with particular focus on health and safety training initiatives.
  • Viridor Biodiversity Action Plans in place at three key sites - Tatchells, Warmwell and Odcombe closed landfills. UK Biodiversity Benchmark initial assessment passed.
Viridor Operations Number
Head / Regional Office 6
Support Services (other) 5
Educational Centres 7
Material Recycling Facilities (MRF) 18
Transfer stations and other recycling 45
Composting 11
Household Waste Recycling Centres 78
Energy from Waste (EfW) 3
Power Plants (Landfill Gas) 31
Liquid Waste Services 3
Landfill Operational 22
Landfill Closed 24
Collection services (depot) 29
TOTAL NO. OPERATING UNITS 282
BASE DATA 2009-10
Total waste inputs to Viridor facilities 6.6 million tonnes
Total waste handled 7.8 million tonnes
Total organic waste composted 171,000 tonnes
TOTAL WASTE RECYCLED BY VIRIDOR * 1.7 million tonnes
Organic waste sent to 3rd party sites 198,000 tonnes
Total material recovered for recycling 1.9 million tonnes
Relative amounts of materials recovered as a proportion of total waste inputs 29%
Renewable power generation capacity ** 130.5 MW

* includes organic waste composted and traded recycling volumes
** includes 3MW of sub-contract capacity in Suffolk